Skip Top nav bar link group topnav end piece go to business section go to education section go to history section go to gallery section go to news section go to organizations section go to research section go to search engine go to site index topnav end piece
NASA Meatball NASA Dryden STS Approach and Landing Tests (ALT) banner

STS Approach and Landing Tests (ALT)

DFRC Photo # Photo Date Image Description
  Skip links in main table STS Approach and Landing Tests (ALT) Photo Collection Contact Sheet
ECN-6887 1977 First Shuttle/747 captive flight
ECN-8607 September 26, 1977 Enterprise - free flight after separation from 747
ECN77-8608 September 26, 1977 Enterprise - free flight after separation from 747
ECN-8611 September 26, 1977 Enterprise - free flight after separation from 747
EC95-43116-26 October 12, 1977 Enterprise - First tailcone off free flight
ECN-8923 October 12, 1977 Enterprise separates from 747 SCA for First tailcone off free flight

The Space Shuttle Enterprise never flew in space. It was the first Space Shuttle built (completed on September 17, 1976), and was used only for aeronautical flight testing. The Enterprise arrived at Dryden in January 1977 for a flight program involving a Boeing 747 airliner that had been modified for use as a shuttle carrier aircraft (SCA).

The first flights with the Space Shuttle attached to the SCA were done to find out how well the two vehicles flew together. Five "captive-inactive" flights were made during this test phase; there was no crew in the Enterprise. The next series of tests were done with a flight crew of two onboard the Space Shuttle during three captive flights, with the Enterprise piloted and its systems activated. All of this led to the Space Shuttle Approach and Landing Tests (ALT), which began on August 12, 1977.

The ALT program allowed pilots and engineers to learn how the Space Shuttle handled during low-speed flight and landing. The Enterprise was flown by a crew of two after it was released from its pylons on the SCA at an altitude of 19,000 to 26,000 feet.

The Enterprise did not have a propulsion system, but its first four glides to the Rogers Dry Lake runway provided realistic, in-flight simulations of how subsequent Space Shuttles would be flown at the end of an orbital mission. The fifth approach and landing test, with the Enterprise landing on the Edwards Air Force Base concrete runway, revealed a problem with the Space Shuttle flight control system that made it susceptible to Pilot-Induced Oscillation (PIO), a potentially dangerous control problem during a landing. Further research using other NASA aircraft, especially the F-8 Digital Fly-By-Wire aircraft, led to correction of the PIO problem before the first orbital flight.

The Enterprise's last free-flight was on October 26, 1977. The following spring it was ferried to other NASA Centers for ground-based flight simulations that tested the Space Shuttle systems and structure.



Last Modified: April 29, 1996
Responsible NASA Official: Marty Curry
Curator: PAO Webmasters

NASA Website Privacy Statement